After sample approval and receipt of the deposit, regular bulk orders typically take 25–40 days to complete. Orders placed during peak season, large mixed-product programs, and models requiring new tooling may need a separately confirmed schedule to ensure that the agreed ex-factory date is achievable.
The production lead time covers material preparation, manufacturing, testing, and packing of shower panels and related products. The lead time begins once the sample has been approved and the deposit has been received, as these two steps confirm the product specifications and allow production to be scheduled. Delays may result from late artwork approval, unfinished finish confirmation, or high production workloads during peak season. We confirm the expected delivery window in the order confirmation once the required details have been finalized.
If part of your order is urgent, we can discuss a split shipment so that priority models can be dispatched first. The proposed dates will need to be checked against the current production schedule rather than assumed from the standard 25–40-day lead time.